Copy and paste this code to insert a reference to this article in your
blog or online community profile:
Assessment of the Efficiency of a Pilot Constructed Wetland on the Remediation of Water Quality; Case Study of Litani River, Lebanon
Environ Pollut Climate Change 2017, 1:2. 1:1, (2017)
https://doi.org/10.4172/2573-458X.1000119
Highlight
Will Display Like this:
Assessment of the Efficiency of a Pilot Constructed Wetland on the Remediation of Water Quality; Case Study of Litani River, Lebanon
Environ Pollut Climate Change 2017, 1:2. 1:1, (2017)
https://doi.org/10.4172/2573-458X.1000119
Powered by
OMICS International